Khammam-Vijayawada -Pkg-II :
Preliminary Survey
Khammam-Vijayawada -Pkg-II :
R.O.W Pillar Fixing
Khammam-Vijayawada -Pkg-II :
Tree Measurement
Khammam-Vijayawada -Pkg-II :
Electrical Utility Survey
Khammam-Vijayawada -Pkg-II :
UDS Sample Collection along with IE
Khammam-Vijayawada -Pkg-II :
Joint Inspection survey for Joint Memorandum
Joint Inspection survey for Joint Memorandum
Khammam-Vijayawada -Pkg-II :
UDS Sample Collection along with IE
Khammam-Vijayawada -Pkg-II :
Clearing and Grubbing
Clearing and Grubbing
Clearing and Grubbing
Clearing and Grubbing
Clearing and Grubbing
Clearing and Grubbing
Clearing and Grubbing
Clearing and Grubbing
Clearing and Grubbing
Clearing and Grubbing
Clearing and Grubbing
Clearing and Grubbing
Clearing and Grubbing
Clearing and Grubbing
Clearing and Grubbing
Clearing and Grubbing
Clearing and Grubbing
Clearing and Grubbing
Clearing and Grubbing
Khammam-Vijayawada -Pkg-II :
Excavation-Structures
Excavation-Structures
Excavation-Structures
Excavation-Structures
Excavation-Structures
Excavation-Structures
Excavation-Structures
Excavation-Structures
Khammam-Vijayawada -Pkg-II :
PCC-Structures
Khammam-Vijayawada -Pkg-II :
Foundation-Structures
Foundation-Structures
Foundation-Structures
Foundation-Structures
Khammam-Vijayawada -Pkg-II :
RS-1 Emulsion Viscosity Test with Team Leader
Khammam-Vijayawada -Pkg-II :
Borrow area no 12, Khammampadu, MDD confirmatory checking under progress along with IE TL
Khammam-Vijayawada -Pkg-II :
Ch 254+184 km Box Culvert Ready to pour concrete.
Khammam-Vijayawada -Pkg-II :
259+832 BC (6×3) BHS Raft Steel Binding in progress
Khammam-Vijayawada -Pkg-II :
259+442 LHSMCW IC VUP Slab Steel Binding in progress
Khammam-Vijayawada -Pkg-II :
259+442 LHS/MCW VUP Slab Steel Binding in progress
Khammam-Vijayawada -Pkg-II :
259+442 LHSMCW VUP Slab Steel Binding in progress
Khammam-Vijayawada -Pkg-II :
252+280 to 252+700 Embankment 1st layer (RHS) & 254+100 to 254+540 BS Embankment 1st layer
252+280 to 252+700 Embankment 1st layer (RHS) & 254+100 to 254+540 BS Embankment 1st layer
Khammam-Vijayawada -Pkg-II :
Ch:267+400 to 267+550 RHS EMB Top layer FDD testing in progress Sir Thickness:255 mm Compaction Result:97.19% sir PASS
Ch:267+400 to 267+550 RHS EMB Top layer FDD testing in progress Sir Thickness:255 mm Compaction Result:97.19% sir PASS
Khammam-Vijayawada -Pkg-II :
Ch:269+260 to 269+420 RHS Sub grade Top layer FDD testing in progress Thickness:258 mm Compaction Result:99.56% PASS
Ch:269+260 to 269+420 RHS Sub grade Top layer FDD testing in progress Thickness:258 mm Compaction Result:99.56% PASS
Khammam-Vijayawada -Pkg-II :
Kerb Trail patch Completed at Base camp with IE team witness.
Kerb Trail patch Completed at Base camp with IE team witness.
Kerb Trail patch Completed at Base camp with IE team witness.
Khammam-Vijayawada -Pkg-II :
276+250 to 276+400 RHS Krab Laying in progress
Khammam-Vijayawada -Pkg-II :
269+400 to 269+700 LHS Sg top Layer preparation Completed & Rolling work in progress.
Khammam-Vijayawada -Pkg-II :
271+040 to 271+200 LHS Sg top Preparation Completed & Rolling work in progress.
MEIL Remidicherla Roadways Pvt Ltd :
DBM Sample Collection Along With IE
MEIL Remidicherla Roadways Pvt Ltd :
DBM Laying in Progress at Ch 276+200
MEIL Remidicherla Roadways Pvt Ltd :
RE Panel Erection in Progress at Ch 253+700
MEIL Remidicherla Roadways Pvt Ltd :
WMM in Progress at Ch 266+960
Khammam-Vijayawada -Pkg-II :
Ch252+400 to 252+600 LHS EMB Top layer FDD testing in progress Sir Thickness260 mm Compaction Result98.16% PASS
Khammam-Vijayawada -Pkg-II :
Ch:268+820 to 269+040 RHS WMM Top layer FDD testing in progress Sir Thickness:180 mm Compaction Result:100.87% PASS
Khammam-Vijayawada -Pkg-II :
Ch274+045 MJB first PSC girder concrete work in progress
Ch274+045 MJB first PSC girder concrete work in progress
Ch274+045 MJB first PSC girder concrete work in progress
Ch274+045 MJB first PSC girder concrete work in progress
Khammam-Vijayawada -Pkg-II :
NHAI - DM sir site visit under progress along with IE representatives at project site
NHAI - DM sir site visit under progress along with IE representatives at project site
NHAI - DM sir site visit under progress along with IE representatives at project site
Khammam-Vijayawada -Pkg-II :
269+700 LHS kerb laying in progress
Khammam-Vijayawada -Pkg-II :
Ch: 267+800 to 267+920 PCL marking completed
Khammam-Vijayawada -Pkg-II :
Marking completed
Khammam-Vijayawada -Pkg-II :
Ch@264+730km/MNB /LHS MCW top slab Haunch bar placing and tying work is in progress
MEIL Remidicherla Roadways Pvt Ltd :
IE Site Visit
MEIL Remidicherla Roadways Pvt Ltd :
Authority & IE team Laboratory inspection.
MEIL Remidicherla Roadways Pvt Ltd :
Authority & IE team Laboratory inspection.
Construction of 4-Lane Access Controlled Green field Highway Section of NH-163G (kHAMMAM-VIJAYAWADA)Pkg-II :
Member NHAI Site Visitd on 04.07.2026
Construction of 4-Lane Access Controlled Green field Highway Section of NH-163G (kHAMMAM-VIJAYAWADA)Pkg-II :
RE Wall
RE Wall
RE Wall
Construction of 4-Lane Access Controlled Green field Highway Section of NH-163G (kHAMMAM-VIJAYAWADA)Pkg-II :
Structures
Structures
Structures
Construction of 4-Lane Access Controlled Green field Highway Section of NH-163G (kHAMMAM-VIJAYAWADA)Pkg-II :
DCPT Testing at RE Wall Location
Construction of 4-Lane Access Controlled Green field Highway Section of NH-163G (kHAMMAM-VIJAYAWADA)Pkg-II :
Piling at Ch 250+818 RA-2
Construction of 4-Lane Access Controlled Green field Highway Section of NH-163G (kHAMMAM-VIJAYAWADA)Pkg-II :
FDD Checking at RE Wall Loaction
Construction of 4-Lane Access Controlled Green field Highway Section of NH-163G (kHAMMAM-VIJAYAWADA)Pkg-II :
Pile Integrity Test at 250+818 MJB LA1
Construction of 4-Lane Access Controlled Green field Highway Section of NH-163G (kHAMMAM-VIJAYAWADA)Pkg-II :
Pile Integrity Test at 250+818 MJB LA1
Construction of 4-Lane Access Controlled Green field Highway Section of NH-163G (kHAMMAM-VIJAYAWADA)Pkg-II :
DCP Testing in progress at Ch 254820 To 254960 LHS Wall 1
Construction of 4-Lane Access Controlled Green field Highway Section of NH-163G (kHAMMAM-VIJAYAWADA)Pkg-II :
FDD Checking From Ch 261+850 To 262+080 -Emb Layer dated on 18.07.2026
Construction of 4-Lane Access Controlled Green field Highway Section of NH-163G (kHAMMAM-VIJAYAWADA)Pkg-II :
CTSB Laying in Progress From Ch 262+950 To 262+140-LHS-DATED 18.07.2026
Khammam - Vijayawada pkg 2 :
Progress photos for the month of Sept - 26
Khammam - Vijayawada pkg 2 :
Progress photos for the month of Oct - 26
Progress photos for the month of Oct - 26
Progress photos for the month of Oct - 26
Progress photos for the month of Oct - 26